Skew Bridge Time Lapse Videos.

Below are the time lapse videos of the construction of the Portishead Skew Bridge.

The bridge is made up of two reinforced earth approach ramps and a 155m long composite deck over five spans. Access to lift the bridge was granted in 4 separate weekend rail line possessions.

Camera 1

Camera 2


Featured Posts
Recent Posts
Archive